Division I successfully passed the acceptance of cleaner production audit
December 25th morning, the Chongqing Municipal Environmental Protection Bureau assessment center in Division I in cleaner production audit of audit inspection, deputy general manager of the company Qin Shaohong, Wang Zengxiang accompanied the audit, the company deputy general manager Yu Bing company to carry out cleaner production audit work to the expert group to make a report.
The cleaner production audit work started at the beginning of the year, the environmental protection work throughout the company, the company leadership attaches great importance, therefore, was set up by the deputy general manager Qin Shaohong for the team leader, Wang Zengxiang of vise general manager and deputy chief engineer Yu Bing is assistant group leader, each production workshop and the main functions of departments responsible for the cleaning member first the production of the audit team, have a clear division of labor, the responsibility to the people.
Implementation of cleaner production program is the core link of cleaner production audit, during the audit of cleaner production audit, company leading group were collected to the workshop presented no low cost plan total more than 100, ultimately approved the 46 free low fee scheme and 3 high fee proposal for the implementation of. These low cost options are workshop production in the long-term process of constantly sum up the foundation, which is composed mostly of workshop basic-level staff to put forward, to not spend a lot of money can improve the operation environment, reduce leakage, reduce material consumption and waste generation purposes. At the same time, in the entire audit process, fully mobilize the enthusiasm of the staff, the local environmental protection management has been further strengthened, staff awareness of environmental protection has been further improved, the staff and workshop, workshop and corporate audit team to form a good interaction.
Through the implementation of the 46 free low fee programmes and 3 in high cost plan, obtained very good economic benefits and environmental benefits. On one hand to improve the resource utilization rate of energy, a year can save 2800000 of natural gas, and 200000 tons of water, electricity 126600 kilowatts, saving 1000 tons of steam, saving 28 tons of sugar, soda 15 tons; on the other hand, improves the utilization rate of raw materials and the product yield, reduce product loss, gained 12470000 yuan economic benefits, in addition, also obtained the obvious environmental benefit every year 16000 tons, reducing the amount of waste water, sewage is about 180000 tons, while reducing the amount of carbon dioxide, dust and sulfur dioxide emissions, workshop production environment gets further improvement.
Finally, review group think, I Division in the cleaner production audit of cleaner production process specification, goal setting is reasonable, clean production scheme feasibility through the implementation of strong, obtained better result, agreed to Division I through the acceptance.